Company drills for engine crews.
A FireOps Calc drill library for hose deployment, water supply, FDC support, master stream setup, relay supply, and pump operator evaluation. These pages are original training organizers and are not a substitute for the official NFPA 1410 standard.
Ready-to-run evolutions
Each drill includes objective, setup, evolution flow, pump-operator focus, common mistakes, and an evaluator checklist.
Single-Engine Attack Line Drill
Deploy one attack line, establish a pump discharge pressure, and maintain water while the crew advances and flows.
Open drill →Flow managementTwo-Line Attack Evolution
Deploy and pump two attack lines while maintaining safe pressure, flow, and communication.
Open drill →Water supplyHydrant Supply to Attack Line Drill
Establish a hydrant supply, transition from tank water, and maintain the attack-line pressure.
Open drill →Standpipe / FDCStandpipe / FDC Operations Drill
Practice supplying an FDC or standpipe scenario using department policy pressure and proper hose layout.
Open drill →Large flowMaster Stream Deployment Drill
Deploy a portable monitor or deck gun, calculate safe flow, and confirm water supply before sustained operation.
Open drill →Relay / LDHRelay / LDH Supply Drill
Set up a relay-style supply evolution with target flow, intake pressure, spacing discussion, and communication.
Open drill →FDC / sprinklerSprinkler FDC Supply Drill
Practice identifying the sprinkler FDC, supplying according to department policy, and avoiding confusion with standpipe operations.
Open drill →Supply layReverse Lay Water Supply Drill
Practice reverse lay decision-making, hose deployment, and engineer actions for a supply-focused evolution.
Open drill →How to use these drills
Evaluator focus
- Correct apparatus placement and pump engagement.
- Water supply established or planned before sustained flow.
- Target PDP selected from calculator, pump card, or SOP.
- Hose deployment is safe, organized, and free of major kinks.
- Clear communication between crew and pump operator.
- Safety issues corrected before increasing flow.
