Flow management

Two-Line Attack Evolution

Deploy and pump two attack lines while maintaining safe pressure, flow, and communication. This is an original FireOps Calc drill organizer for NFPA 1410-style training and department-level practice.

Use local standards: Set staffing, time benchmark, PPE, water flow, hose load, and pass/fail criteria from your department SOP and official NFPA documents. This page does not reproduce the official NFPA standard.

Objective

Practice adding a second line without losing control of the first line or over-pumping either crew.

Setup

  • Engine with two attack lines available
  • Two hose teams
  • Pump operator and evaluator
  • Water supply from tank or hydrant depending on department SOP

Evolution flow

First line deploys and receives water.
Engineer establishes stable PDP for line one.
Second line deploys to a separate target.
Engineer opens second discharge smoothly and watches pressure behavior.
Both lines flow together.
Crews report stream quality; engineer documents pressure, flow, and intake/tank status.

Engineer focus

  • Gate second line slowly
  • Monitor intake pressure and tank water
  • Do not chase pressure aggressively
  • Understand whether lines require different pressures
  • Communicate before adding or shutting down lines

Common mistakes

  • Opening the second discharge too fast
  • Letting tank water run low without a supply plan
  • Assuming both lines need the same PDP
  • Failing to identify a kink after pressure changes
Evaluator sheet

Score and debrief

Use this as a printable quick score sheet. Add department-specific time targets and safety requirements before the drill.

Evaluation item
Result
Notes
Water established
Yes / Needs work
 
Line/device deployed safely
Yes / Needs work
 
Target pressure selected correctly
Yes / Needs work
 
Communication clear
Yes / Needs work
 
Kinks/hazards corrected
Yes / Needs work
 
Debrief completed
Yes / Needs work
 

After-action questions

  • What was the first delay in the evolution?
  • Was water available before the crew needed sustained flow?
  • Was the pump pressure chosen from a known source or guessed?
  • What did the engineer have to correct during the drill?
  • What will the crew do differently on the next repetition?