Foam operations
Foam Eductor Setup Tool
Set up inline foam eductor training correctly: calculate pressure before the eductor, check downstream demand, and estimate foam concentrate use.

Foam eductor setup
For many inline eductors, pump pressure is based on the required eductor inlet pressure plus loss before the eductor. Do not add nozzle pressure after the eductor to the pump pressure unless your manufacturer/SOP directs it.
Results
Target PDP
—
FL before eductor
—
Downstream demand check
—
Foam time
—
Setup warnings
- Match nozzle GPM to the eductor rating.
- Keep hose after the eductor within manufacturer limits.
- Make sure the pickup tube is seated and the nozzle is fully open.
- Flush the eductor and hose after use.
FireOpsCalc