Foam operations

Foam Eductor Setup Tool

Set up inline foam eductor training correctly: calculate pressure before the eductor, check downstream demand, and estimate foam concentrate use.

Engineer Tools Hub
Foam eductor setup diagram showing pump, hose before eductor, required inlet pressure, hose after eductor, and matched nozzle.
A teaching diagram that shows where pressure matters before the eductor and how the hose/nozzle after the eductor must match the setup.

Foam eductor setup

For many inline eductors, pump pressure is based on the required eductor inlet pressure plus loss before the eductor. Do not add nozzle pressure after the eductor to the pump pressure unless your manufacturer/SOP directs it.

Results

Target PDP
FL before eductor
Downstream demand check
Foam time

Setup warnings